Known for our ability to adapt to complex projects, tight deadlines and unique circumstances, Price Erecting was called to assist MSI General Contractors to build a one-of-a-kind Clean Room in an already existing MGS building.
Brewery Catwalk Installation
After a local brewery overhauled their entire brewing operation, we were called on to fabricate and install catwalks and guardrails around their brewing tanks.
Park Pavilion Update
Konkel Park in Greenfield Wisconsin is in the process of upgrading their pavilion. We had the opportunity to install the metal frame!
Milwaukee Basketball Arena
The future home of Wisconsin’s NBA team is in the process of being built in downtown Milwaukee. We are lucky enough to be a part of the excitement. So far, our Ironworkers have been a part of two projects. First, we placed the rib steel that will eventually be the “curve” of the unique barrel shape of the new arena. Then we assisted in erecting the catwalk frame that will connect the arena to the new parking structure.
Cupola Preservation Project
Partnering with VJS Construction Services, we assisted in the removal of two cupolas from the top of the Sister of St. Francis of Assisi. Our certified riggers and crane operator carefully removed the cupolas from the old building using a crane. These cupolas were put into storage and eventually will be erected on top of the new building.